The structure you build rests on what we set. Foundations, roads, pads, driveways — everything above it depends on what we do first. We set it right, or we don't leave.

GPS-Guided ±0.1 FT Accuracy 18 Counties Compaction Verified
Get a Free Estimate →
"A bad grade costs three times what a good one saves."
Why every project starts at elevation zero
The Standard

What we hold ourselves to on every job.

±0.1 ft
Grade Tolerance

GPS-guided dozer and laser level hold finished grade within one-tenth of a foot from survey benchmark — the tightest standard for slab and pad construction in Georgia.

GPS-GUIDED
Grade Control

Machine-control dozer receives real-time elevation data from GPS base station and automatically adjusts blade position — no re-staking, no manual cut checks between passes.

100%
Compaction Verified

Fill lifts are compacted and density-tested before we apply the next lift. Every sub-grade we hand off has been checked against the geotechnical spec — no assumptions.

1pass sign-off
First-Visit Approval

We don't hand off sites that need re-checking. Our final grade walk verifies positive drainage slope and finished elevation before we call the GC to mobilize.

Build Sequence

From survey stake to final grade.

01

Survey & Benchmark Review

We pull the engineer's survey, locate all grade stakes and benchmarks, confirm property boundaries, and flag underground utilities. No job starts without this walk — ever.

02

Rough Cut & Spoil Management

GPS-guided dozer strips topsoil and moves spoil to designated fill areas. We balance cut and fill on-site wherever possible to minimize haul costs — excess goes to an approved stockpile.

03

Sub-Grade Preparation

Unsuitable material is removed. Select fill is placed in lifts and compacted between each pass. Sub-grade moisture and density are checked against the geotechnical spec before fine grading begins.

04

Fine Grade & Sign-Off

Box blade brings finished grade to engineered elevation. Positive drainage slope is verified with laser level. We don't release the site until elevation matches the permit and drainage runs the right direction.

What We Grade For

Every site type. One crew.

Home Pads

Residential building pads — slab, stem wall, pier-and-beam

🏢

Commercial Sites

Building pads, parking lots, and utility corridors

🛣

Driveways & Access

Rural roads, farm driveways, commercial access lanes

💧

Septic & Drain Fields

Precise slope grading for septic system drain fields

Retention Grading

Positive drainage away from structures, retention area shaping

🏆

Athletic Fields

Engineered slope for drainage — sports fields, track complexes

Request a Quote

Got dirt to move?
Let's walk it Monday.

Send a quick note. We'll text within a business day to set up a free site visit. Most quotes go out within 48 hours.

Tell us about the job

⏱ <48hr reply

Tell us about the job

⏱ <24 hr reply