The structure you build rests on what we set. Foundations, roads, pads, driveways — everything above it depends on what we do first. We set it right, or we don't leave.
"A bad grade costs three times what a good one saves."
GPS-guided dozer and laser level hold finished grade within one-tenth of a foot from survey benchmark — the tightest standard for slab and pad construction in Georgia.
Machine-control dozer receives real-time elevation data from GPS base station and automatically adjusts blade position — no re-staking, no manual cut checks between passes.
Fill lifts are compacted and density-tested before we apply the next lift. Every sub-grade we hand off has been checked against the geotechnical spec — no assumptions.
We don't hand off sites that need re-checking. Our final grade walk verifies positive drainage slope and finished elevation before we call the GC to mobilize.
We pull the engineer's survey, locate all grade stakes and benchmarks, confirm property boundaries, and flag underground utilities. No job starts without this walk — ever.
GPS-guided dozer strips topsoil and moves spoil to designated fill areas. We balance cut and fill on-site wherever possible to minimize haul costs — excess goes to an approved stockpile.
Unsuitable material is removed. Select fill is placed in lifts and compacted between each pass. Sub-grade moisture and density are checked against the geotechnical spec before fine grading begins.
Box blade brings finished grade to engineered elevation. Positive drainage slope is verified with laser level. We don't release the site until elevation matches the permit and drainage runs the right direction.
Residential building pads — slab, stem wall, pier-and-beam
Building pads, parking lots, and utility corridors
Rural roads, farm driveways, commercial access lanes
Precise slope grading for septic system drain fields
Positive drainage away from structures, retention area shaping
Engineered slope for drainage — sports fields, track complexes
Send a quick note. We'll text within a business day to set up a free site visit. Most quotes go out within 48 hours.